Dec 2022 and Jan 2023
Despite external delays the project continues due to the perseverance of Ninotte and the RWE staff. Enjoy the photos below.
Photo 1: Window and door frames were painted during this period.
Photo 2: Framing for interior walls is a combination of light gauge steel and wood stud.
Photo 3: Interior wall framing.
Photo 4: 100 Amp Panel with breakers installed within interior wall of the laundry room area.
Photo 5: Interior concrete walls with primer and 1-coat of off-white paint. 2nd coat to follow.
Photo 6: Drywall panels installed and tape/mud work is on-going.
Photo 7: Formwork for walkway concrete.
Photo 8: Installation for walkway concrete.
Photo 9: Walkway concrete is complete. Space for plants is provided.
Photo 10: Concrete walkway in the rear of the building is complete.
Photo 11: Additional concrete cap added along masonry perimeter wall as well. Space for plants provided along walkway. Plantings to provide shade, and reduce impact of dust and driving rain.
Photo 12: The doors are on-site.
Photo 13: Finishing the masonry wall concrete cap.
Photo 14: Note the plumbing to the water tower is installed. Exterior wall touch-up on-going.
Photo 15: Same comment as 14.
Photo 16: Completed wall touch-up in this section. Concrete walkway and cap complete.